This photo documents the installation
of a drainage conduit.
|
|

This photo documents excavation for the asphalt cutoff trench area at Hamilton Army Airfield.
|
|
|
|
|
These photos document the excavation of runway asphalt at Settling Basin #1. |
|

This photo documents a portion of the levees at the Hamilton Army Airfield.
|
|

Silt fence installed at the Pacheco Levee.
|
|

Removal of excess soil from an access ramp.
|
|

Following the removal of excess soil, the remaining soil is compacted as shown.
|
|

Excavation at the project site.
|
|

Close-up of haul trucks on runway, looking northwest.
|
|

Offloading asphalt at the project site.
|
|

Land surveyors laying out the location of a new levee.
|
|

Geogrid installation at the Pacheco/Bulge levee.
|
|

Installation of geotextile fabric on interior ramp.
|
|

Compacting Pacheco Levee east end.
|
|

Photo showing preliminary grading of side slopes and maintenance road near NHP levee.
|
|

Conducting compaction test.
|
|

Disking soil surface for subsequent
placement of material.
|
|

Grading N-1 levee embankment.
|
|
|
|
|
|